A typical data center cooling method in medium- to large-sized data centers is chilled water, which uses heated water to cool air delivered in by air handlers (CRAHs). A chiller plant somewhere in the building provides water.
The process of cooling a data center involves taking out the air’s extra heat and replacing it with cooler air. The most common method for doing this is to vent hot air outside before bringing outside air inside, cooling it, and then circulating it around the building.
The data centre may employ extremely effective evaporative cooling towers since the water used for computer cooling is rather warm (up to 75°F). In the HPC systems, water is continuously circulated through heat exchangers to effectively absorb waste heat.
The Nigeria Data center water-cooled chiller system market accounted for $XX Billion in 2022 and is anticipated to reach $XX Billion by 2030, registering a CAGR of XX% from 2023 to 2030.
Vertiv launches a chilled-water thermal wall for slab floor data centers.A new chilled water wall from Vertiv has been introduced; it is made to fit with more recent slab floor data centers.
The CWA, introduced in EMEA, is intended to enhance the efficiency of chilled water cooling in data centers constructed in line with the current fashion and without elevated floors. The US-designed CWA chilled-water thermal wall cooling unit comes in capacities of 250kW, 350kW, and 500kW.
In buildings with high floors, cold air seeps into the racks from below the floor. Large data centers, such those used by hyperscalers, are constructed with a low-velocity air flow throughout the structure. This technology is sold by Stulz, which introduced CyberWall cooling, and Aligned, which has been utilizing it for a while.
The Liebert CWA is integrated into the data center outside of the IT racks and is made to occupy the least amount of room feasible, allowing for increased density and more racks.
It has built-in ventilation controls. It may be combined with the chilled water system of the data center to enhance the performance of the complete cooling network.Compared to specially manufactured cooling walls, the CWA is a standardised product with less expensive installation expenses.
Vertiv guarantees that its data centre architecture and operation will adhere to the dependability standards established by the certification bodies.